Critical Environments

Where operational
continuity is
non-negotiable.

PTW
Permit-to-work environments
6
Facility Typologies
Live
Live retrofit capability

Why We Build Critical Environments

Critical infrastructure
demands zero compromise

Data centres, substations, and energy infrastructure operate under conditions where any disruption to the live environment carries consequences far beyond the construction site. These facilities demand contractors who understand permit-to-work regimes, operational continuity, and the zero-tolerance standards that govern critical infrastructure.

Conroy delivers for data centre operators, grid operators, private wire developers, and EPC partners — as general contractor or within integrated delivery teams.

AI compute workloads, cloud migration, and enterprise digital infrastructure are driving sustained demand for data centre construction across Ireland and Europe. Hyperscale campus expansion, colocation capacity growth, and edge deployment are creating a multi-year pipeline of new-build, retrofit, and campus civil works — requiring contractors with proven live-environment delivery capability.

EirGrid's grid development programme, ESB Networks infrastructure investment, and Ireland's renewable energy targets are driving significant demand for substation construction, grid connection civil works, and transmission infrastructure. This pipeline requires contractors experienced in delivering under HV safety rules and within EPC delivery frameworks.

Ireland's installed base of operational data centres generates a sustained, recurring pipeline of capacity upgrades, life-cycle replacements, and white space fit-out. This work is delivered on live campuses where operational continuity is maintained throughout — a distinct construction discipline from new-build delivery.

Ireland's renewable energy targets and grid balancing requirements are driving a substantial BESS pipeline. Battery storage facilities require civil works, specialist foundations, fire suppression infrastructure, and grid connection — delivered within EPC frameworks to compressed programme timelines aligned with grid energisation dates.

Large energy consumers — data centres, manufacturing campuses, and industrial facilities — are investing in dedicated power infrastructure to secure supply and manage cost. Private wire developments, on-site generation, and dedicated grid connections are creating a distinct construction pipeline of substation buildings, power distribution infrastructure, and campus-wide civil works.

What We Build

Six facility types.
One delivery standard.

Data Centre — New Build

Small MW data hall construction, power infrastructure buildings, and campus civil works. Delivered as general contractor with full CSA and MEP integration on greenfield and brownfield sites.

Small MW delivery Data halls Power buildings Campus civils
Data Centre — Live Retrofit

HAC/CAC corridor works, structural grid modifications, raised access floor and floor void works, white space fit-out, and facility expansion on operational campuses. Life-cycle replacements and capacity upgrades delivered under full permit-to-work regime without disruption to live operations.

HAC / CAC Structural mods Floor void works Facility expansion PTW regime
Substation Construction

Civil and structural works for GIS and AIS substations. Delivered under ESB/EirGrid safety rules as general contractor or within EPC delivery teams.

GIS / AIS HV safety rules EPC packages
BESS Facilities

Battery energy storage system enclosures, foundations, fire suppression infrastructure, and grid connection civil works. Delivered within EPC frameworks to compressed programme timelines.

Foundations Enclosures EPC delivery
Grid & Renewable Energy

Grid connection civil works, renewable energy foundations, and generation plant buildings. Programme and site works co-ordinated with grid operators, equipment suppliers, and DNO/TSO inspection milestones.

Grid connections Renewables civils Generation plant
Control Buildings & Switch Rooms

Standalone control rooms, relay rooms, SCADA buildings, and MV/LV switch rooms. Precision-built enclosures for sensitive electrical and communications equipment with environmental control and EMC shielding.

Control rooms SCADA buildings EMC shielding
Conroy — Critical Environments
Zero Disruption.
Absolute Certainty.
Critical Environments — site delivery

What We Build — Technical Specification

The numbers
that govern delivery

Every specification below is established at Stage 2 and locked into the design brief — ensuring consistency from design through to delivery.

Structural Frame & Grid
RC / Precast / Steel

Reinforced concrete for data halls — thermal mass, vibration performance, and fire rating. Steel frame for power buildings and generator enclosures. Precast where programme speed is the priority. Structural grid designed around rack layout and equipment positions.

Slab & Foundations
Piled / Ground-bearing

Reinforced slab design for server rack, battery array, and transformer point loads. Ground-bearing or pile-supported to suit ground conditions. Load schedule co-ordinated with equipment suppliers from Stage 2.

Power Infrastructure Civils
HV / MV / LV

Civil and structural works for the full power chain — HV switchgear rooms, transformer compounds, generator enclosures, UPS rooms, and busbar risers. Interface with M&E contractors co-ordinated from pre-construction through to commissioning.

Cooling Infrastructure Civils
CRAH / Chiller Plant

CRAH unit bases, chiller plant pads, pipework risers, and hot/cold aisle containment civils. Civil interface with the mechanical contractor co-ordinated to protect the cooling commissioning programme.

Raised Access Floor & Containment
600mm — 1200mm void

Raised access floor systems, cable management, and containment infrastructure. Floor void depth co-ordinated with power and cooling distribution strategy. Loading capacity matched to rack and equipment specification.

Envelope & Cladding
Insulated Panel / Composite

Weathertight envelope for data halls and power buildings with acoustic and thermal performance targets. Fire-rated construction where required between data halls and adjacent plant areas.

Fire Suppression
Gas / Pre-action / Foam

Gas suppression for data hall white space, pre-action sprinkler for common areas, and foam suppression for transformer bunds and oil-filled equipment. System design co-ordinated with facility operator and insurance underwriter.

External Works & Campus Civils
HV Routes / Hardstanding

HV cable trenches, duct banks, campus roads, hardstanding, surface water drainage, and security perimeter infrastructure. Site-wide civils co-ordinated with the campus masterplan and phased delivery programme.

How We Deliver

Operational continuity
is the baseline

Construction on live data centre campuses, high-voltage substations, and energy infrastructure sites demands permit-to-work discipline, method statement rigour, and absolute programme certainty. Our delivery model is built around maintaining operational continuity throughout.

Construction methodology, programme sequencing, and logistics planned around operational continuity of the live environment. Permit-to-work regime, isolation procedures, and method statements developed during pre-construction. Package procurement, long-lead identification, and BIM co-ordination completed before mobilisation — ensuring programme certainty from day one.

Structural steel, precast concrete, cladding, and fire suppression systems are procured early — before design is finalised on secondary packages. Lead times on these items govern the programme. We identify, price, and place orders on long-lead packages during pre-construction to protect the critical path from day one.

4D programme developed at appointment and maintained throughout. Target cost plan with risk-weighted allowances and formal change control. Programme updated weekly from site data, cost reported monthly, and the anticipated final account maintained as a live document — giving the client full visibility at every stage.

Director-led site delivery with dedicated management and structured quality inspections throughout. Interface between construction works and live operations managed through formal isolation procedures, permit-to-work co-ordination, and method statements reviewed and approved before every critical intervention.

Structured digital handover — O&M manuals, as-built drawings, BIM model, and COBie data formatted for FM integration. Integrated systems testing and commissioning support co-ordinated with the client's operations team. 12-month defects liability period with active management.

Critical Environment Delivery Approach
Critical environments facility — data centre construction
Site delivery — Critical Environments

Start a Conversation

Your critical infrastructure
needs a contractor you can trust.

Whether you are a data centre operator planning a campus expansion, a grid operator tendering civil works, or an EPC partner sourcing a construction delivery team — we'd welcome the opportunity to discuss your project.

Director Contact
James Conroy
Procurement
D&B / Detail & Build / Traditional / EPC Packages
Appointment stage
RIAI/RIBA Stage 2 — or Stage 3 onward